Campus/VIC
Miners Rest integrated data-centre site
Campus in Miners Rest, Ballarat, VIC · X2M Connect / Resi Ventures
The record
- Status
- Proposed
announced or lodged for approval - Capacity as stated
- 100 MW10–100 MW concept
- Operator
- X2M Connect / Resi Ventures
- Record type
- Campus
several buildings on one site - Location
- Miners Rest, Ballarat, Victoria
Show on the map (approximate) - Evidence grade
- REPORTED
it rests on a credible secondary source or the applicant's own description - Last checked
- 21 Oct 2026
- NSW application
- Not on the NSW register
- Source
- Data Center Dynamics