Campus/VIC
STACK MEL02
Campus in Melbourne west, VIC · STACK Infrastructure
The record
- Status
- Under construction
construction has started - Capacity as stated
- 252 MW252 MW
- Operator
- STACK Infrastructure
- Record type
- Campus
several buildings on one site - Location
- Melbourne west, Victoria
Show on the map (approximate) - Evidence grade
- SOLID
a primary document or direct operator disclosure confirms it - Last checked
- 21 Oct 2026
- NSW application
- Not on the NSW register
- Source
- STACK Infrastructure
More
Track the whole pipeline. The quarterly pipeline report covers every sourced project, the decisions to watch and a spreadsheet.
Spotted something wrong or out of date? Tell us, with a source if you can. Material changes are dated in the corrections log.