Campus/NSW
Mayfield Energy Precinct
Campus in Near Denman, Upper Hunter (pin approximate), NSW · Akaysha Energy and Malabar Resources
The record
- Status
- Proposed
announced or lodged for approval - Capacity as stated
- 2,000 MWUp to 1 GW IT (plus 2 GW / 8 GWh battery)
- Operator
- Akaysha Energy and Malabar Resources
- Record type
- Campus
several buildings on one site - Location
- Near Denman, Upper Hunter (pin approximate), New South Wales
Show on the map (approximate) - Evidence grade
- REPORTED
it rests on a credible secondary source or the applicant's own description - Last checked
- 21 Oct 2026
- NSW application
- Not on the NSW register
- Source
- Alt Energy
More
Track the whole pipeline. The quarterly pipeline report covers every sourced project, the decisions to watch and a spreadsheet.
Spotted something wrong or out of date? Tell us, with a source if you can. Material changes are dated in the corrections log.