Campus/VIC
Keppel Morwell AI campus
Campus in Morwell, VIC · Keppel
The record
- Status
- Proposed
announced or lodged for approval - Capacity as stated
- 720 MWUp to 720 MW gross power
- Operator
- Keppel
- Record type
- Campus
several buildings on one site - Location
- Morwell, Victoria
Show on the map (approximate) - Evidence grade
- SOLID
a primary document or direct operator disclosure confirms it - Last checked
- 21 Oct 2026
- NSW application
- Not on the NSW register
- Source
- Keppel
More
Track the whole pipeline. The quarterly pipeline report covers every sourced project, the decisions to watch and a spreadsheet.
Spotted something wrong or out of date? Tell us, with a source if you can. Material changes are dated in the corrections log.