RegularsAIData centre tracker

Campus/WA

GreenSquareDC WAi1

Campus in Hazelmere, WA · GreenSquareDC

The record

Status
Withdrawn
withdrawn by the applicant, kept for the record
Capacity as stated
120 MW~120 MW
Operator
GreenSquareDC
Record type
Campus
several buildings on one site
Location
Hazelmere, Western Australia
Show on the map (approximate)
Evidence grade
REPORTED
it rests on a credible secondary source or the applicant's own description
Last checked
21 Oct 2026
NSW application
Not on the NSW register

More

Track the whole pipeline. The quarterly pipeline report covers every sourced project, the decisions to watch and a spreadsheet.

Spotted something wrong or out of date? Tell us, with a source if you can. Material changes are dated in the corrections log.