Firmus Bell Bay AI factory
Campus in Bell Bay / Long Reach, TAS · Firmus Technologies
The record
- Status
- Committed
approved or otherwise committed, but construction isn't confirmed - Capacity as stated
- 288 MW~288 MW maximum site demand
- Operator
- Firmus Technologies
- Record type
- Campus
several buildings on one site - Location
- Bell Bay / Long Reach, Tasmania
Show on the map (approximate) - Evidence grade
- REPORTED
it rests on a credible secondary source or the applicant's own description - Last checked
- 21 Oct 2026