Facility/VIC
DoverDC SM1A
Facility in South Morang, VIC · Dover DC
The record
- Status
- Committed
approved or otherwise committed, but construction isn't confirmed - Capacity as stated
- 120 MWUp to 120 MW developer-stated
- Operator
- Dover DC
- Record type
- Facility
one building or site - Location
- South Morang, Victoria
Show on the map (approximate) - Evidence grade
- SOLID
a primary document or direct operator disclosure confirms it - Last checked
- 25 Oct 2026
- NSW application
- Not on the NSW register
More
Track the whole pipeline. The quarterly pipeline report covers every sourced project, the decisions to watch and a spreadsheet.
Spotted something wrong or out of date? Tell us, with a source if you can. Material changes are dated in the corrections log.