RegularsAIData centre tracker

Campus/ACT

CDC Hume Campus 3

Campus in Hume (Block 28 Section 23), ACT · CDC Data Centres

The record

Status
Proposed
announced or lodged for approval
Capacity as stated
576 MWAbout 576 MW combined (preliminary, as stated)
Operator
CDC Data Centres
Record type
Campus
several buildings on one site
Location
Hume (Block 28 Section 23), Australian Capital Territory
Evidence grade
SOLID
a primary document or direct operator disclosure confirms it
Last checked
19 Oct 2026
NSW application
Not on the NSW register

More

Track the whole pipeline. The quarterly pipeline report covers every sourced project, the decisions to watch and a spreadsheet.

Spotted something wrong or out of date? Tell us, with a source if you can. Material changes are dated in the corrections log.