Campus/SA
Aurora Energy Precinct AI campus
Campus in Port Augusta region, SA · Undisclosed Australian operator
The record
- Status
- Proposed
announced or lodged for approval - Capacity as stated
- 1,000 MW17 MW first stage / ~200 MW anchor / up to 1 GW pathway
- Operator
- Undisclosed Australian operator
- Record type
- Campus
several buildings on one site - Location
- Port Augusta region, South Australia
Show on the map (approximate) - Evidence grade
- REPORTED
it rests on a credible secondary source or the applicant's own description - Last checked
- 25 Oct 2026
- NSW application
- Not on the NSW register
- Source
- 1414 Degrees
More
Track the whole pipeline. The quarterly pipeline report covers every sourced project, the decisions to watch and a spreadsheet.
Spotted something wrong or out of date? Tell us, with a source if you can. Material changes are dated in the corrections log.