Campus in Derrimut, VIC · AirTrunk

The record

Status
Operational
operating today, according to the operator or a primary source
Capacity as stated
276 MW276 MW+ (AirTrunk, Dec 2025)
Operator
AirTrunk
Record type
Campus
several buildings on one site
Location
Derrimut, Victoria
Show on the map (approximate)
Evidence grade
REPORTED
it rests on a credible secondary source or the applicant's own description
Last checked
21 Oct 2026
NSW application
Not on the NSW register
Source
W.Media

More